Why do I need a load connection on a charge controller?

I just got a Morningstar Sunlight charge controller. I connected the controller to the PV system and the battery. I also have a 300W inverter directly connected to the battery bank.

I am wondering why we have a "load" connection on the charge controller. Shouldn't I connect my load directly on the battery?

Thanks for your help.

File Attachment(s):