Solar Articles

  • Solar Wire Management
One of the most important tasks when installing a PV system is wire management.  This task is sometimes overlooked by installers or not given enough attention. Installers that take their wire...
Support Article
8/11/2018
  • Solectria
  The Problem Many inverters installed in the last 10+ years are now failing and are no longer protected by the original product warranty. With limited possibilities of extending warranty coverage,...
Support Article
6/13/2017
  • Solar panels varry in wattage
It is a common question we hear often at CivicSolar.  A customer has an assortment of modules they want to install in the same system.  They have a stockpile on hand that they want to put to good...
Support Article
2/11/2016
  • Maximum Power Point - MPP
Designing systems so that panels operate as closely as possible to their Maximum Power Point is critical to maximizing the performance of the system. A large central inverter such as the Solectria...
Support Article
9/7/2015
  NEC 2014: Article 690.12 “Rapid Shutdown of PV Systems on Buildings” There were several changes to the 2014 NEC code that affect PV systems.  Of these changes, the most notable is article 690...
Support Article
1/5/2015
  • Evolution of Power Conversion
As the solar industry looks for new ways to increase efficiency and drive down cost, inverters have gone from the relatively simple to decode Central, String and Micro options to a bewildering...
Support Article
10/8/2014
  • Solectria Dual MPPT Inverters
When I first became aware of dual MPPT inverters I asked myself, "Self, why didn't you think of that?"  This simple, yet powerful concept provides for simplified PV system design, increased solar...
Support Article
10/8/2014
  • Nationally Recognized Testing Laboratory, cec certification solar
NRTL certification means your solar panels and solar modules conform to safety, health, and environmental standards as required by: NEC, OSHA, and the National Fire Prevention Association. NRTL...
Support Article
9/22/2011