Solar Articles

  • Solar Wire Management
One of the most important tasks when installing a PV system is wire management.  This task is sometimes overlooked by installers or not given enough attention. Installers that take their wire...
Support Article
8/11/2018
  • Commercial Ballasted Solar Rooftop
Step 1 First, assess the wind speed and snow load of the project area against the unobstructed flat roof space. The objective is to prevent uplift from the modules in the event of windy conditions....
Support Article
12/12/2017
  • Solectria
  The Problem Many inverters installed in the last 10+ years are now failing and are no longer protected by the original product warranty. With limited possibilities of extending warranty coverage,...
Support Article
6/13/2017
  • Solar Under a Buck
    Earlier this year CivicSolar launched a promotion entitled Solar Under a Buck to much fan fair. It has a tongue and cheek description of our new commercial solar offering, a complete solar...
Support Article
4/18/2016
  NEC 2014: Article 690.12 “Rapid Shutdown of PV Systems on Buildings” There were several changes to the 2014 NEC code that affect PV systems.  Of these changes, the most notable is article 690...
Support Article
1/5/2015
  • Aerocompact Example Installation
  Frequently asked questions:   What is Aerocompact? A aerodynamically designed and engineered ballast flat roof system   Which tilts are available? 5...
Support Article
4/16/2014
  • Nationally Recognized Testing Laboratory, cec certification solar
NRTL certification means your solar panels and solar modules conform to safety, health, and environmental standards as required by: NEC, OSHA, and the National Fire Prevention Association. NRTL...
Support Article
9/22/2011