Installer Support

Default image
The solar design process is a critical starting point in executing a solar photovoltaic (PV) project. In the age of accessible satellite imagery and innovative software development, designing solar...
Support Article
4/26/2017
Default image
I had an account and now when I go to log in, it does not recognize my email address.  Could someone help with this? cshellum@solarconnectioninc.com Curt Shellum        
Support Question
4/26/2017
Default image
Support Article
4/24/2017
  • Simpliphi
Cómo diseñar sistemas con baterías - Parte 1 ¡Lo más importante son las cargas!   Incluir baterías en un sistema de energía solar tiene muchas ventajas pero ya que sus aplicaciones pueden ser muy...
Support Article
4/18/2017
  • GS Battery
But how do we begin integrating storage into our PV systems? And particularly, if we focus on batteries, which batteries do we use? Various battery technologies are thoroughly examined in this Solar...
Support Article
4/18/2017
  • StorEdge
The SolarEdge StorEdge system DC couples the solar array and energy storage to a common dual-role inverter. By maintaining a high voltage DC connection between the PV modules and the battery the...
Support Article
4/18/2017
  • SGIP
What is SGIP? SGIP stands for Self Generation Incentive Program. The CPUC has budgeted $270M (75%, $202.6 for energy storage) through 2019 for rebates that support existing and new distributed...
Support Article
4/11/2017
Default image
Building a pergola.  See attachments.  Want to screw rails diectly to timbers in order to mount Sunpreme Maxima GxB (QTY 9). Want to put rails perpendicular to joists.  May recess rails into joists...
Support Question
4/10/2017
Default image
I have a customer that would like an approximately 10kW AC inverter interconnected at their home. The main breaker is 200A rated and the bus/panel is also 200A. Will this work?
Support Question
4/7/2017
Default image
Hi Can I install a step down transformer to grid tie a SolarEdge inverter that outputs 240V to 208V?  And if so, which would be the best transformer? Apparently my location uses 120V/208V electrical...
Support Question
4/6/2017
Default image
Hi Can I install a step down transformer to grid tie a SolarEdge inverter that outputs 240V to 208V?  And if so, which would be the best transformer? Apparently my location uses 120V/208V electrical...
Support Question
4/6/2017
Default image
I'm hoping you can give me some advice.  I thank you in advance.  I recently purchased 14 Jinkosolar panels  310 watt. JKM 310P-72.  Im looking for a off grid application.  I am wondering is it...
Support Question
4/6/2017
  • LatAm
Hello Spanish speakers! We are pleased to introduce our team dedicated to the Southern California and Latin America regions. Each of its members carries years of experience in the industry, which...
Support Article
4/4/2017
  • S-5!
If you’ve been installing rooftop PV systems and haven’t yet heard of S-5!, it’s time to stop living under that rock. S-5! provides attachment solutions and comprehensive load tables for the majority...
Support Article
4/4/2017
  • panel trends
The International Technology Roadmap for Photovoltaics is a yearly report designed to inform and educate PV suppliers and contractors on the direction of the industry. In its eighth year, the report...
Support Article
4/4/2017
Default image
I would like to install a generator to a grid tied SMA SunnyBoy & Sunny Island system tied into an essentials panel. I need advice on a transfer switch that has a relay bult in to tie to the...
Support Question
4/2/2017

Pages